ZHENGOU GroupZHENG'OU

Application

Healthcare & public buildings

Wheeled traffic, disinfectant exposure and appearance that has to hold up for a decade of public use.

What this floor has to withstand

Understand the failure mode before choosing a system.

  1. 01

    Wheeled traffic never stops — beds, trolleys and cleaning machines run over the same paths all day.

  2. 02

    Disinfectants are part of daily routine; the surface has to take them without fading or chalking.

  3. 03

    The look has to survive a decade of public use — colour stability matters as much as wear.

  4. 04

    Renovation usually happens with the building still in use.

Healthcare & public buildings

Recommended coating systems

Selected by duty — there is no universal system, only the one that fits.

02

Decorative floating-sand self-levelling

Build-up
Primer → floating-sand self-levelling, aggregate exposed on the surface

For lobbies and public halls where the floor is part of the interior design — with an anti-slip texture built in.

Products in this system

03

Waterborne polyurethane topcoat

Build-up
Sound existing floor, abraded → waterborne polyurethane topcoat

A fast refresh for floors that are structurally sound but visually tired — low odour, quick return to service.

Products in this system

Standard application sequence

The same floor with the same materials can last years longer when the work is carried out carefully. The six steps below are our standard sequence for epoxy floors: what each step does, to what standard, and what we check on handover. For your workshop we fine-tune the number of layers and the thickness to the actual loads, chemicals and shutdown window.

  1. 01

    Substrate preparation

    Grinding and repair with dust extraction — essential when the building stays occupied. Noise and dust are kept within the hospital's site rules, with work hours avoiding clinic peaks.

  2. 02

    Primer and build-up

    Sealing primer, then mortar and filler to a flat base. Low-odour products are used, with isolation and dust containment between the works and treatment areas.

  3. 03

    Topcoat

    Self-levelling or decorative finish applied area by area. Colours are configured to each department's wayfinding needs and confirmed with a trial layout before completion.

  4. 04

    Phased handover

    Each completed area returns to service on schedule, so the building never closes. Each finished phase is cleaned, disinfected and accepted immediately, dovetailed with the hospital's schedule.

On-site photos

Finished floors photographed on site — click to enlarge and inspect the detail.

Public hall

Decorative floating-sand finish standing up to daily foot traffic.

Corridor & treatment area

Seamless self-levelling under wheeled traffic, easy to disinfect.

Terrazzo-style public floor

Epoxy terrazzo look with long-term colour stability.

Representative projects

A selection of projects delivered by the group.

  • Clean-area flooring for pharmaceutical clients

    The requirement here matches a pharmaceutical clean room: seamless, washable, coved up the wall, with no joints for residue to sit in. We have delivered exactly these build-ups for Shineway Pharmaceutical, Huahai Pharmaceutical and Xinhua Pharmaceutical — the same systems suit clinical and laboratory areas.

Common questions

What buyers ask most when specifying a floor coating.

Can you work while the building stays open?

Yes — the work is zoned, dust is extracted at source, and low-odour solvent-free materials are used; each area reopens on schedule.

Learn more
Will disinfectants dull the surface?

Cured surfaces tolerate scheduled disinfection; for specific agents, share the chemical list at design stage and we match the topcoat.

Learn more
How do we keep the appearance over years?

Colour-stable binders plus a wear surface chosen for the traffic level; when the surface eventually dulls, a renewal topcoat restores it without redoing the floor.

Learn more
Is the decorative finish slippery?

The floating-sand texture exposes aggregate at the surface — it is inherently grippier than a smooth self-levelling gloss.

Learn more

Tell us about your floor

Send the substrate, the area and what the floor has to survive. You will get a recommended system, a build-up drawing and a quotation — usually within one business day.

Request a quote